Tuesday 22 December 2009

Vanguard Packaging Ltd - Lincoln
For this project ESH supplied and installed trace heating to maintain the skid pipework at a temperature of +60°C in a minimum ambient temperature which could be between +13°C and +50°C. 250m of HFBT (ATEX approved) high temperature self regulating heating tape required.

Monday 21 December 2009

Premier Foods Ltd - Kent
Supplied 60m of type SC constant wattage cable.

Friday 18 December 2009

Morris Lubricants - Shrewsbury
This large scale project required 2500m of constant wattage cable to complete the work. ESH designed and supplied materials and labour to install and commission trace heating to maintain the internal blending pipework at a temperature of +60°C and the tank farm pipework at +25°C.

Thursday 17 December 2009

Fareham Community Hospital 
To design and supply materials, tools and labour to install and commission self regulating trace heating to frost protect 79m of metal pipework.

Monday 14 December 2009

Leigh WWTW
ESH provided frost protection trace heating to the metal construction external pipework. 70m of FBT self regulating trace heating tape was supplied and installed.

Friday 11 December 2009

Bardon Quarry - Coalville
To supply and install trace heating to provide frost protection of the wash water pipework in the Ten Plant Load House. In total 166m of VC constant wattage cable was required.

Wednesday 9 December 2009

Petersfinger STW - Salisbury
Ferric Chloride frost protection trace heating. ESH supplied and installed 63m of ESRS self limiting heating tape to frost protect the ferric chloride pipework and fittings.

Monday 7 December 2009

Baton Lane WWTW - Preston
60m of metal construction pipework was surface heated to provide frost protection. Type FBT self regulating heating tape was supplied and installed.

Wednesday 2 December 2009

Snarrows STW - Osgathorpe
To supply and install a trace heating system to frost protect the washwater pipework in the inlet works area: 

  • Upper screen area, 16m
  • Longmoor screen area, two sets 4m each

Tuesday 1 December 2009

Building 7, Harbourside - Bristol 
For this project ESH supplied and installed the following trace heating systems: 

  • To prove frost protection to 488m of CHW and heating pipework, between 65mm and 150mm size pipe
  • To provide frost protection to 87m of 40mm and 25mm dia MCW pipework to the AHU and humidifiers

Friday 27 November 2009

Burscough WWTW - Southport
Designed, supplied and installed trace heating to provide frost protection in the following areas:

  • Jet mix pumping station, 30m of pipework
  • Lime area shower & hose pipework, 10m
  • Ferric Area shower & hose, 15m

Thursday 26 November 2009

SI Group UK - Wolverhampton
For this world leading chemical manufacturer ESH supplied and installed a trace heating system to frost protect 1" CWS to the new emergency shower pipework in a Zone 1 Gas Group 11b Classification T3 Hazardous Area.

Wednesday 25 November 2009

PZ Cousons - Salford
Trace heating was supplied and installed to provide frost protection to 12m of plastic pipework.

Monday 23 November 2009

Stepan (UK) Ltd - Cheshire
Designed, supplied and installed trace heating to two runs of metal pipework, 114m in total, to maintain +70°C and to keep within T4 classification. 114m of SCBX constant wattage heating tape for hazardous area.

Friday 20 November 2009

Rushmoor STW - Telford
58m of stainless steel pipework required frost protecting within this STW. ESH supplied and installed type FBT self limiting heating tape.

Wednesday 18 November 2009

Asda Store - South Woodham
Before this new Asda store opened, ESH supplied and installed both trace heating and thermal insulation to provide frost protection to 80m of fire sprinkler pipework.

Monday 16 November 2009

Stepan (UK) Ltd - Cheshire
100m of VCBOJ constant wattage trace heating cable was supplied and installed to maintain the 2" coconut oil pipe line & tank at +50°C.

Friday 13 November 2009

Lincoln County Hospital
Supplied 100m of type ESRS self limiting tape to be installed within the junior doctors ward.

Thursday 12 November 2009

Terram Limited - Pontypool 
Trace heating and thermal insulation was supplied and installed onto the Thermex pipework to maintain a temperature of +20°C. 140m of VC constant wattage heating cable was supplied and installed.

Wednesday 11 November 2009

ASDA Stores - Hinckley / Leyton

For the new Hinckley store ESH supplied and installed the Trace Heating and Thermal Insulation to frost protect 142m of sprinkler pipework. We also supplied 1100m of VC8/2 tape for the new Leyton ASDA.

http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
Asda Warehouse - Hinckley
For this project ESH supplied and installed both trace heating and thermal insulation to frost protect 142m of sprinkler pipework.

Tuesday 10 November 2009

DGISS Sports Hall - Corsham
Within the headquarters of the MOD's Directorate General of Information Services and Systems (DGISS), ESH supplied and installed frost protection trace heating in two air handling units areas, comprising of the chilled water & hot water flow & return pipework.

Friday 6 November 2009

Wigton WWTW
Supplied materials and labour to install and commission trace heating to provide frost protection to the external pipework and tank.

Thursday 5 November 2009

Stadco Ltd - Shrewsbury
This local project required us to supply and install a trace heating and lagging system to provide frost protection to the pipework associated with the duel pump module.

Tuesday 27 October 2009

Crawshaw School - Pudsey
The project scope was to design, supply materials and tools to install and commission trace heating to maintain the DHWS pipework at a temperature of +55°C, with the facility to purge the system to +65°C once a week via a control module. In total 400m of H2OWAT65 was supplied and installed.

Friday 23 October 2009

Boots Store - Nottingham
To design and supply materials and labour to install both trace heating and thermal insulation to frost protect the metal sprinkler pipework within this new Boots store.

Tuesday 20 October 2009

Unilever - Wirral
Unilever is the world's third largest consumer goods company. Within the Wirral site ESH supplied and installed a trace heating system to frost protect the external diesel fuel line.

Monday 19 October 2009

St Helen & St Katharine School
Within this leading independent day school for girls, ESH supplied and installed frost protection to the following pipework: 

  • 65m of CHW 2" pipe
  • 70m of heating pipe
  • 32m of small bore pipework run around coil
  • 20m of small bore pipe on the roof

Friday 16 October 2009

Temple Moor High School - Leeds
This project involved ESH supplying and installing frost protection trace heating to the HTG pipework on the roof area and to the sprinkler tank pipework.

Thursday 15 October 2009

Timothy Taylors Brewery - Keighley
For this regional brewery founded in 1858, ESH supplied and installed the trace heating system to provide frost protection to the 28mm and 35mm copper pipework.

Wednesday 14 October 2009

Brady Ltd - Bristol
Trace heating of sodium hydroxide tanks. For this project ESH supplied and installed the trace heating system to maintain the two, 3 metre diameter x 6 metre long, mild steel vessels at +25°C in a minimum ambient temperature of -15°C.

Monday 12 October 2009

Forbes Ltd - Kelso
Designed and supplied the materials to temperature maintain a tank (1.75m dia x 2.5m high).

Thursday 8 October 2009

North Chelmsford NHS Healthcare Centre
Supplied and installed a trace heating system to frost protect the sprinkler pipework.

Wednesday 7 October 2009

Pocklington Industrial Estate - York
To design and supply materials and labour to install trace heating and thermal insulation to provide frost protection to the 50mm steel pipe with 40mm foil finish mineral wool insulation.

Wednesday 30 September 2009

Broomfield Hospital - Chelmsford
367m of chilled water, BCWS and heating pipework was installed with trace heating to provide frost protection. Type FBT self regulating tape was supplied and installed.

Monday 28 September 2009

Stepan (UK) Ltd - Cheshire
Another project within the large site, this time ESH supplied and installed a trace heating system to maintain the internal caustic line at +40°C.

Friday 25 September 2009

Carlisle WWTW 
Both the plastic and metal lime sludge pipework required frost protecting. ESH supplied and installed 200m of FBT self regulating trace heating tape to complete this project.
Stepan (UK) Ltd - Cheshire
Supplied and installed 55m of VCBOJ constant wattage trace heating tape to temperature maintain the raw product pipework at +50°C.

Thursday 24 September 2009

M&S Store - Morpeth
The project scope for this new M&S store was to supply and install the following trace heating systems: 

  • Frost protect 71m of heating pipework
  • Frost protect 28m of mains cold, tank cold & cold water down pipework
  • Temperature maintain 20m of hot water pipework at +60°C

Wednesday 23 September 2009

Manchester Central Convention Complex 
The Manchester central is an exhibition and conference centre converted from the former railway station. Here ESH supplied and installed trace heating to provide frost protection on external pipework, pumps and fittings.

Tuesday 22 September 2009

Fovant STW - Salisbury
171m of type VC constant wattage heating tape was supplied and installed to provide frost protection to 7 different areas around the STW site.

Tuesday 15 September 2009

Leigh Waste Water
Supplied materials, tools and labour to install and commission trace heating to provide frost protection to 3 runs x 10m of 62mm OD external pipework.

Monday 14 September 2009

Asda Store - Leyton
ESH supplied just over 1000m of type VC constant wattage cable to this large project.

Thursday 10 September 2009

Loreto Sixth Form College - Manchester 
504m of type H20WAT65 self regulating trace heating tape was supplied and installed to maintain the DHWS pipework at +55°C and enabling the system to be purged to +65°C. Also frost protection was provided to the roof mounted CHW & HTG pipework.

Friday 4 September 2009

Beckley STW
ESH provided both trace heating and thermal insulation to frost protect the de-sludge pump and its associated pipework. Type FBT self limiting tape was supplied and installed.

Friday 28 August 2009

British Nuclear Fuels - Preston
Designed, supplied and installed a trace heating system to maintain the 50mm and 80mm Ã˜ caustic pipework at a temperature of +20°C.

Tuesday 25 August 2009

M&S Store - Witney
This M&S project required ESH to supply and install trace heating to provide frost protection to the MCW, BCW and hot water (flow & return) pipework.

Monday 24 August 2009

The Generating Station - Monmouthshire
To supply and install temperature maintenance trace heating: 

  • Two runs of 25mm stainless steel pipe ewach approx 15m long, 
  • Five short extensions to previously installed trace heating, at burner pipe connections. All 21mm stainless steel pipe.

Sunday 23 August 2009

Cadburys - Sheffield 
For this chocolate lovers dream project, ESH supplied and installed the trace heating system to temperature maintain the following glucose pipework at +55°C: 

  • 350m of 4" Ã˜ pipework
  • 250m 2.5" Ã˜ pipework
  • 100m of 2" Ã˜ pipework  

Tuesday 18 August 2009

ASDA Supermarket - Ashford
Supplied this project with 400m of type VC constant wattage trace heating tape.

Monday 17 August 2009

Montpelier High School - Plymouth
Supplied 62m of type H2OWAT55 self regulating heating tape to provide temperature maintenance.

Friday 14 August 2009

M&S - Whitechapel St, Liverpool
For this M&S store ESH provided frost protection to the 6" chiller pipework on the roof area. 140m of FBT self regulating heating tape was supplied and installed to complete this project.

Thursday 13 August 2009

Chandlers Wharf Apartments - Liverpool
ESH were contracted to supply and install a trace heating system to the DHWS in order to maintain the pipework temperature at +55°C.
Airdale General Hospital
Frost protection of the CHW roof area pipework. Supplied and installed.

Tuesday 11 August 2009

Port Talbot WTW
A trace heating system was supplied and installed for the frost protection of 4 condensate pots and 136m of pipework within a hazardous area.
Hugbridge Pumping Station
ESH designed, supplied and installed trace heating to maintain a large storage tank (2m Ã˜ x 3m high) at 40°C using 4 x 400w 110v heater pads.

Friday 31 July 2009

Kings College London - Institute Of Psychiatry 
587m of type VC constant wattage tape was supplied to this new project.

Thursday 30 July 2009

West Lewis WTW - Isle Of Lewis
Supplied 250m of type FBTBOJ self limiting heating tape as well as 250m of 199mm thick x 35mm OD armaflex insulation.

Monday 27 July 2009

Picket Fence Pumping Station - Cheltenham
Supplied, installed and commissioned the frost protection trace heating of the external steel and iron pipework.

Friday 24 July 2009

B&Q Headquarters - Eastleigh
For this large project ESH supplied and installed the following trace heating: 

  • Temperature maintenance of 65C to the DHWS pipework, plus two off HWAT ECO controllers
  • Frost protection on category 5 cold water pipework

Thursday 23 July 2009

Roundhill STW - Stourbridge
To design and supply materials and labour to install and commission frost protection trace heating to 65m of washwater pipework and fittings associated with two Spirac machines and three Inlet screens.

Wednesday 22 July 2009

Springfields Fuels Ltd - Preston
For this industrial project, ESH supplied and installed trace heating to maintain the steam pipework at a minimum temperature of +200°C.

Monday 20 July 2009

Lions Yard Shopping Centre - Cambridge
For this chiller replacement project, ESH supplied and installed trace heating to provide frost protection of the chilled water and heating steel pipework.

Friday 17 July 2009

Riverside Primary School - Hereford
Supplied and installed trace heating to temperature maintain pipework carrying domestic hot water at +55°C.

Wednesday 15 July 2009

Le Pain Quotidien - London
For this lovely French restaurant in London, ESH provided frost protection to two separate lengths of metal pipework. Supply and install.

Friday 10 July 2009

Milton Keynes Academy 
Within this new academy, ESH supplied and installed type H2OWAT65 self regulating heating tape to provide temperature maintenance of +60°C to the HWS pipework.

Tuesday 7 July 2009

Victoria Halls - Wolverhampton
For Wolverhampton's largest student accommodation building, ESH supplied and installed trace heating and thermal insulation to provide frost protection to three runs of pipework:

  • 18m x 100mm tank infill
  • 18m x 100mm wet riser pipe
  • 16m x 180mm sprinkler main

Monday 6 July 2009

Harrogate South WWTW




ESH designed, supplied materials and labour to installed and commission trace heating and thermal insulation to provide frost protect 370m of external pipework.

Thursday 2 July 2009

Greenfrog Power Ltd - Hull
6m of fuel pipework was installed with type VC constant wattage heating cable to provide temperature maintenance at 65°C.

Tuesday 30 June 2009

Immaculate Conception Catholic Primary School - Sheffield 
350m of H2OWAT55 self regulating trace heating tape was supplied and installed to the DHWS pipework in order to maintain the temperature at +55°C.

Monday 29 June 2009

Kimberleys Chocolate - Burton On Trent
Supplied type VC constant wattage cable to be installed onto the sprinkler system.

Monday 22 June 2009

Stepan (UK) Ltd - Cheshire
ESH supplied materials and labour to install and commission the trace heating system to provide frost protection to the following pipework: 

  • 20m within the Sulphonic area
  • 20m in the Sulphonic Drumming off area
  • 75m within the Organics Tank farm area

Friday 12 June 2009

The Generating Station - Monmouthshire
The project was to trace heat 261m of steel pipe from 21mm OD to 89mm OD using type VC constant wattage heating tape, arranged in 6 heating zones. The pipework was to be temperature maintained at +60°C and contained oil.

Wednesday 10 June 2009

Livestock Market - Sterling
280m of type VC constant wattage heating tape was supplied to this site.

Friday 5 June 2009

Uniq Prepared Foods - Minsterley
Our second project within this site involved supplying and installing a trace heating system to maintain palm oil pipework at +50°C.

Tuesday 2 June 2009

Walsall Security Printers
To supply and install trace heating and thermal insulation to provide frost protection to the cold water pipework.

Monday 1 June 2009

Asda Supermarket - Glenrothes 
Supplied type ESRSBJO self limiting heating tape to be installed within this new ASDA store.

Thursday 28 May 2009

University Of Glamorgan
Part of the kitchen refurbishment, ESH supplied materials and labour to install and commission the trace heating to provide temperature maintenance at +55°C to DHWS pipework. 

Friday 22 May 2009

Buckinghamshire University 
Within the new university building, ESH supplied and installed trace heating to provide frost protection on all CHW & MWS external water pipework, mounted on the roof.

Wednesday 20 May 2009

City Inns - Leeds
Our second project for this modern hotel involved ESH supplying and installing the trace heating system to provide frost protection to the chiller pipework.

Thursday 14 May 2009

Proctor & Gamble - Tyne Wear
For this leading consumer product company, ESH supplied and installed trace heating and thermal insulation to frost protect pipework in the dry pallet area.

Tuesday 12 May 2009

Libanus Primary School - Newport
120m of DHWS pipework was installed with type H20WAT55 heating tape, in order to temperature maintain the pipework at +55°C. Trace heating was supplied and installed by ESH.

Saturday 9 May 2009

Lewes Castle & Barbican House Museum
ESH supplied this project with our type VC constant wattage heating cable.

Friday 1 May 2009

City Inn - Leeds


Now the Hilton Leeds, ESH supplied and installed Trace Heating to maintain the domestic hot water system at 55 degrees C. To cover this 333 bedroom modern hotel we needed over 900m of H2OWAT65 heating cable.

Thursday 30 April 2009

PZ Cousons - Manchester 
PZ Cussons is a major manufacturer of personal healthcare products and consumer goods.Trace heating was supplied and installed to provide frost protection to 15m of steel pipework. 

Thursday 23 April 2009

Ipswich Hospital - Incinerator Plant
To supply and install trace heating to maintain the Limestone Hopper at +160°C in a minimum ambient temperature of 0°C.

Tuesday 21 April 2009

Glaxosmithkline Effluent Plant - Maidenhead
ESH were contracted to design, supply materials and labour to install and commission 240v trace heating and thermal insulation to provide frost protection to 12 runs of plastic pipework in the Effluent Plant. 140m of type ESRSBOJ self limiting heat tape was required.

Friday 17 April 2009

Roslin BioCentre Ltd - Midlothian
Roslin BioCentre is a world-leading ‘centre of excellence’ for life sciences. For this project ESH supplied and installed trace heating to provide frost protection to the following pipework: 

  • Roof top CHW, BCWS and MCWS
  • Roof void BCWS and MCWS

Wednesday 15 April 2009

Bio Products Laboratory - Watford
The Bio Products Laboratory (BPL) is a company involved in the manufacture of human blood plasma products. The project here was to supply and install trace heating to maintain the caustic & vent pipework at +20°C in a minimum ambient temperature of -10°C.

Tuesday 14 April 2009

Cricket Pavilion - Wootton
For this pavilion ESH supplied materials and labour to install and commission trace heating to temperature maintain flow pipework carry domestic hot water to douches.

Monday 13 April 2009

Princes Dock - Liverpool
For this large scale project, ESH designed, supplied, installed and commissioned three ramp heating systems for the Princes Dock multi storey car park. Overall 700m of type FBTBOJ self limiting heating tape was required to complete the ramp heating systems.

Thursday 9 April 2009

Samlesbury Aerodrome - Blackburn
180m of VC constant wattage heating tape was supplied and installed to provide frost protection to external pipework.

Wednesday 8 April 2009

White House - Alveston
To supply and install trace heating to maintain 51m of DHWS pipework at +55°C.

Monday 6 April 2009

Sungard Control Centre - Woking
ESH were contracted to go back to this site to supply and install an additional 250m of frost protection trace heating to the external chilled water pipework.

Wednesday 1 April 2009

Hayden STW - Cheltenham
The project scope was to supply materials and labour to install and commission the frost protection trace heating of Ductile iron pipework within both the centrate and grit classifier areas.

Thursday 26 March 2009

Celanese Acetate Ltd - Derby
ESH provided and installed trace heating to the external 500mm water pipework and also the 75mm Infil pipework, in order to provide frost protection.

Wednesday 25 March 2009

Stepan (UK) Ltd - Cheshire
To design, supply and install the trace heating system to provide temperature maintenance of +42°C on two circuit blowheads.

Friday 20 March 2009

Whitlingham WWTW - Norwich
Our second project at this site involved us supplying and installing frost protection trace heating to three condensate pots, 1.1m tall, 0.8m dia, in an area classified as electrically hazardous.

Monday 16 March 2009

Bredon STW 
100m of type ESRS self limiting trace heating tape was supplied to this project.

Friday 13 March 2009

Tesco - Bournemouth 
Supplied type VC constant wattage cable to be installed onto the sprinkler system.
Brunel Healthcare - Swadlincote
Designed and supplied materials and labour to install and commission trace heating to provide frost protection to 150mm Ã˜ above the ground trunk main pipework.

Thursday 12 March 2009

Bettys Tea Room - Harrogate
For this project ESH supplied materials and labour to install and commission the trace heating system to provide frost protection to the 2", 2.5" and 3" steel pipework containing water.

Wednesday 11 March 2009

Liverpool Womens Hospital 
200m of type H2OWAT65 self regulating trace heating tape was supplied and installed to temperature maintain the hot water services pipework at +55°C, within the private patients unit.

Friday 6 March 2009

Hill Barton STW - Devon
To supply and install 110 volt type trace heating to frost protect a 30m section of external pipework.

Wednesday 4 March 2009

Whitlingham WWTW - Norwich
To supply and install trace heating to frost protect the following pipework: 

  • One run of plastic washwater pipework
  • One sludge pump set

Monday 2 March 2009

Eisai Europe - Hatfield 
This project at Hatfield Business Park, involved ESH supplying and installing trace heating and thermal insulation to provide frost protection to approximately 82m of plastic pipework in the Effluent Plant.

Friday 27 February 2009

Guildford Clinic 
ESH supplied and installed trace heating to frost protect the external CHW pipework.
Shiplake College - Oxfordshire
ESH were contracted to supply and install trace heating to maintain the domestic hot water pipework at 55°C, with the ability to raise the pipework to 65°C for disinfection purposes.

Monday 23 February 2009

Salisbury County Courts


ESH supplied and installed Trace Heating to provide frost protection to approximately 1050m of metal pipework within this three storey building. The pipework include the CHW, MWS, BCWS, HWS and Heating pipes.

http://www.traceheatingdirect.com/self-regulating-heating-tapes/self-regulating-heating-tape-type-fbt.html
Andrew Corporation - USA
Designed and supplied 32 x 3.7m dish heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Friday 20 February 2009

BT Stadium House - Cardiff
Stadium House is the second tallest building in Cardif and is owned by the BT Group. During its 7.1m refurbishment programme, ESH were contracted to supply and install trace heating to provide frost protection to approximately 110m of ABS pipework. 

Wednesday 18 February 2009

Avonmouth STW
Trace heating for approximately 160m of pipework using type SCBX (ATEX Certified) constant wattage heating tape. ESH supplied and install the frost protection system on four sets of sludge pipework in an area classified as electrically hazardous.

Monday 16 February 2009

The Peel Centre - Bracknell
Supplied materials and labour to install and commission a trace heating system to provide frost protection for the 200mm & 50mm Ã˜ pipework.

Thursday 12 February 2009

Stepan (UK) Ltd - Cheshire
Supplied and installed a temperature maintenance system designed to maintain +70°C within a Hazardous area.

Tuesday 10 February 2009

Glasgow Caledonian University
Designed and supplied 3 x IGS glass insulated high temperature heating tapes, 6m long 2500 watts 240v.

Monday 9 February 2009

Queens University - Belfast
Supplied 854m of type FBT self regulating heating tape to provide frost protection to the steel pipework.

Wednesday 4 February 2009

Halewood International - Liverpool
Halewood have grown to become the UK's largest independent alcoholic beverages manufacturer and ESH were contracted to supply and install trace heating to provide temperature maintenance at +55°C to the stainless steel glucose pipework.

Tuesday 3 February 2009

Hidcote Manor - Chipping Campden
This national trust owned building is surrounded by some of the best known and influential arts and crafts gardens in Britain. For the main building ESH supplied and installed trace heating to frost protect two runs of cold water copper pipework.

Monday 2 February 2009

Lydney STW
54m of steel pipework was installed with type VC constant wattage heating tape to provide frost protection.

Saturday 31 January 2009

George Bateman Brewery - Wainfleet
The project scope within this English brewery, founded in 1874, was to provide trace heating to the following systems: 

  • Stream 1 pipe line 15m, for Sodium Hydroxide - trace heating and lagging
  • Stream 2 pipe line 6m, for Sodium Hydroxide - trace heating and lagging
  • Stream 3 pipe line 20m, for nutrient - lagging only
  • Soium hyroxide dosing cabinet pipework 3m - trace heating and lagging
ESH supplied and installed the trace heating system to maintain the above pipework at +10C.

Friday 30 January 2009

Country Confectionery - Cornwall
Supplied type VCB constant wattage heating tape to this manufacturer of chocolate, fudge and toffee confectionery products.
Temple Moor High School - Leeds
Trace heated 380m of DHWS pipework to maintain a temperature of +55°C, with the facility to purge the DHWS to +65°C once a week via a control module. ESH supplied and installed the materials.

Wednesday 28 January 2009

Sentrum - Woking
ESH were contracted to design, supply and install trace heating to provide frost protection to three buffer Vessels 10m x 1.2m Ã˜. This project required 165m of VC constant wattage heating tape.

Tuesday 27 January 2009

Uniq Prepared Foods - Minsterley
ESH supplied and installed trace heating to temperature maintain sugar pipework at +20°C.
Queen Elizabeth Hospital - Edgbaston
For this project ESH supplied and installed trace heating to provide frost protection on 40m of copper pipework within Car Park D.

Monday 26 January 2009

Chilcote WTW
Type FBTBOJ self limiting heating cable was used to trace heat approximately 64m of ABS pipe. The pipework was also thermal insulated by ESH, to provide full frost protection.
Burnley WWTW
ESH supplied and installed type VC constant wattage heating tape to provide frost protection to external pipework.

Friday 23 January 2009

Sungard Control Centre - Woking
222m of external chilled water pipework was frost protected using type VC constant wattage heating cable. ESH supplied and installed materials.
Chelmsley Wood Shopping Centre
To supply materials and labour to install and commission trace heating to provide frost protection to 148m of sprinkler system pipework, located in the loading bay area.

Thursday 22 January 2009

Royal Marsden Hospital
For the Institute of Cancer Research building, ESH supplied type ESRS self limiting heating tape.

Thursday 15 January 2009

KP Snacks - Rotherham 
Supplied this snack giant with our type SC constant wattage heating tape.

Tuesday 13 January 2009

Ferrybridge Power Station - Knottingley
Designed and supplied 4 x large pump heating jackets 1.5KW 110v for a fuel oil system.

Monday 12 January 2009

Stoke City General Hospital
The project scope was to supply and install trace heating to frost protect steel CHW pipework (Terrace area) and copper cooling water pipe (Linac area). The second part to this project saw ESH design, supply and install a leak detection system in the PL1 tank room (LVC system).

Friday 9 January 2009

Airdale General Hospital - Keighley
ESH supplied and installed heating tape for a total of 60m of external CHW pipework, in order to frost protect the roof area.

Tuesday 6 January 2009

Ikea -Southampton
For this new Ikea store ESH supplied and installed 240m of type VC constant wattage heating cable, to temperature maintain two runs of plastic 100mm NB pipework at +30°C.