Vanguard Packaging Ltd - Lincoln
For this project ESH supplied and installed trace heating to maintain the skid pipework at a temperature of +60°C in a minimum ambient temperature which could be between +13°C and +50°C. 250m of HFBT (ATEX approved) high temperature self regulating heating tape required.
Tuesday 22 December 2009
Friday 18 December 2009
Morris Lubricants - Shrewsbury
This large scale project required 2500m of constant wattage cable to complete the work. ESH designed and supplied materials and labour to install and commission trace heating to maintain the internal blending pipework at a temperature of +60°C and the tank farm pipework at +25°C.
This large scale project required 2500m of constant wattage cable to complete the work. ESH designed and supplied materials and labour to install and commission trace heating to maintain the internal blending pipework at a temperature of +60°C and the tank farm pipework at +25°C.
Thursday 17 December 2009
Monday 14 December 2009
Friday 11 December 2009
Wednesday 9 December 2009
Monday 7 December 2009
Wednesday 2 December 2009
Tuesday 1 December 2009
Friday 27 November 2009
Thursday 26 November 2009
Wednesday 25 November 2009
Monday 23 November 2009
Friday 20 November 2009
Wednesday 18 November 2009
Monday 16 November 2009
Friday 13 November 2009
Thursday 12 November 2009
Wednesday 11 November 2009
ASDA Stores - Hinckley / Leyton
For the new Hinckley store ESH supplied and installed the Trace Heating and Thermal Insulation to frost protect 142m of sprinkler pipework. We also supplied 1100m of VC8/2 tape for the new Leyton ASDA.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
For the new Hinckley store ESH supplied and installed the Trace Heating and Thermal Insulation to frost protect 142m of sprinkler pipework. We also supplied 1100m of VC8/2 tape for the new Leyton ASDA.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
Tuesday 10 November 2009
Friday 6 November 2009
Thursday 5 November 2009
Tuesday 27 October 2009
Crawshaw School - Pudsey
The project scope was to design, supply materials and tools to install and commission trace heating to maintain the DHWS pipework at a temperature of +55°C, with the facility to purge the system to +65°C once a week via a control module. In total 400m of H2OWAT65 was supplied and installed.
The project scope was to design, supply materials and tools to install and commission trace heating to maintain the DHWS pipework at a temperature of +55°C, with the facility to purge the system to +65°C once a week via a control module. In total 400m of H2OWAT65 was supplied and installed.
Friday 23 October 2009
Tuesday 20 October 2009
Monday 19 October 2009
Friday 16 October 2009
Thursday 15 October 2009
Wednesday 14 October 2009
Monday 12 October 2009
Thursday 8 October 2009
Wednesday 7 October 2009
Wednesday 30 September 2009
Monday 28 September 2009
Friday 25 September 2009
Thursday 24 September 2009
Wednesday 23 September 2009
Tuesday 22 September 2009
Tuesday 15 September 2009
Monday 14 September 2009
Thursday 10 September 2009
Friday 4 September 2009
Friday 28 August 2009
Tuesday 25 August 2009
Monday 24 August 2009
Sunday 23 August 2009
Tuesday 18 August 2009
Monday 17 August 2009
Friday 14 August 2009
Thursday 13 August 2009
Tuesday 11 August 2009
Friday 31 July 2009
Thursday 30 July 2009
Monday 27 July 2009
Friday 24 July 2009
Thursday 23 July 2009
Wednesday 22 July 2009
Monday 20 July 2009
Friday 17 July 2009
Wednesday 15 July 2009
Friday 10 July 2009
Tuesday 7 July 2009
Monday 6 July 2009
Thursday 2 July 2009
Tuesday 30 June 2009
Monday 29 June 2009
Monday 22 June 2009
Friday 12 June 2009
Wednesday 10 June 2009
Friday 5 June 2009
Tuesday 2 June 2009
Monday 1 June 2009
Thursday 28 May 2009
Friday 22 May 2009
Wednesday 20 May 2009
Thursday 14 May 2009
Tuesday 12 May 2009
Saturday 9 May 2009
Friday 1 May 2009
Thursday 30 April 2009
Thursday 23 April 2009
Tuesday 21 April 2009
Glaxosmithkline Effluent Plant - Maidenhead
ESH were contracted to design, supply materials and labour to install and commission 240v trace heating and thermal insulation to provide frost protection to 12 runs of plastic pipework in the Effluent Plant. 140m of type ESRSBOJ self limiting heat tape was required.
ESH were contracted to design, supply materials and labour to install and commission 240v trace heating and thermal insulation to provide frost protection to 12 runs of plastic pipework in the Effluent Plant. 140m of type ESRSBOJ self limiting heat tape was required.
Friday 17 April 2009
Wednesday 15 April 2009
Tuesday 14 April 2009
Monday 13 April 2009
Thursday 9 April 2009
Wednesday 8 April 2009
Monday 6 April 2009
Wednesday 1 April 2009
Thursday 26 March 2009
Wednesday 25 March 2009
Friday 20 March 2009
Monday 16 March 2009
Friday 13 March 2009
Thursday 12 March 2009
Wednesday 11 March 2009
Friday 6 March 2009
Wednesday 4 March 2009
Monday 2 March 2009
Friday 27 February 2009
Monday 23 February 2009
Salisbury County Courts
ESH supplied and installed Trace Heating to provide frost protection to approximately 1050m of metal pipework within this three storey building. The pipework include the CHW, MWS, BCWS, HWS and Heating pipes.
http://www.traceheatingdirect.com/self-regulating-heating-tapes/self-regulating-heating-tape-type-fbt.html
ESH supplied and installed Trace Heating to provide frost protection to approximately 1050m of metal pipework within this three storey building. The pipework include the CHW, MWS, BCWS, HWS and Heating pipes.
http://www.traceheatingdirect.com/self-regulating-heating-tapes/self-regulating-heating-tape-type-fbt.html
Friday 20 February 2009
Wednesday 18 February 2009
Monday 16 February 2009
Thursday 12 February 2009
Tuesday 10 February 2009
Monday 9 February 2009
Wednesday 4 February 2009
Tuesday 3 February 2009
Monday 2 February 2009
Saturday 31 January 2009
George Bateman Brewery - Wainfleet
The project scope within this English brewery, founded in 1874, was to provide trace heating to the following systems:
The project scope within this English brewery, founded in 1874, was to provide trace heating to the following systems:
- Stream 1 pipe line 15m, for Sodium Hydroxide - trace heating and lagging
- Stream 2 pipe line 6m, for Sodium Hydroxide - trace heating and lagging
- Stream 3 pipe line 20m, for nutrient - lagging only
- Soium hyroxide dosing cabinet pipework 3m - trace heating and lagging
Friday 30 January 2009
Wednesday 28 January 2009
Tuesday 27 January 2009
Monday 26 January 2009
Friday 23 January 2009
Thursday 22 January 2009
Thursday 15 January 2009
Tuesday 13 January 2009
Monday 12 January 2009
Stoke City General Hospital
The project scope was to supply and install trace heating to frost protect steel CHW pipework (Terrace area) and copper cooling water pipe (Linac area). The second part to this project saw ESH design, supply and install a leak detection system in the PL1 tank room (LVC system).
The project scope was to supply and install trace heating to frost protect steel CHW pipework (Terrace area) and copper cooling water pipe (Linac area). The second part to this project saw ESH design, supply and install a leak detection system in the PL1 tank room (LVC system).