Thursday 26 March 2009

Celanese Acetate Ltd - Derby
ESH provided and installed trace heating to the external 500mm water pipework and also the 75mm Infil pipework, in order to provide frost protection.

Wednesday 25 March 2009

Stepan (UK) Ltd - Cheshire
To design, supply and install the trace heating system to provide temperature maintenance of +42°C on two circuit blowheads.

Friday 20 March 2009

Whitlingham WWTW - Norwich
Our second project at this site involved us supplying and installing frost protection trace heating to three condensate pots, 1.1m tall, 0.8m dia, in an area classified as electrically hazardous.

Monday 16 March 2009

Bredon STW 
100m of type ESRS self limiting trace heating tape was supplied to this project.

Friday 13 March 2009

Tesco - Bournemouth 
Supplied type VC constant wattage cable to be installed onto the sprinkler system.
Brunel Healthcare - Swadlincote
Designed and supplied materials and labour to install and commission trace heating to provide frost protection to 150mm Ø above the ground trunk main pipework.

Thursday 12 March 2009

Bettys Tea Room - Harrogate
For this project ESH supplied materials and labour to install and commission the trace heating system to provide frost protection to the 2", 2.5" and 3" steel pipework containing water.

Wednesday 11 March 2009

Liverpool Womens Hospital 
200m of type H2OWAT65 self regulating trace heating tape was supplied and installed to temperature maintain the hot water services pipework at +55°C, within the private patients unit.

Friday 6 March 2009

Hill Barton STW - Devon
To supply and install 110 volt type trace heating to frost protect a 30m section of external pipework.

Wednesday 4 March 2009

Whitlingham WWTW - Norwich
To supply and install trace heating to frost protect the following pipework: 

  • One run of plastic washwater pipework
  • One sludge pump set

Monday 2 March 2009

Eisai Europe - Hatfield 
This project at Hatfield Business Park, involved ESH supplying and installing trace heating and thermal insulation to provide frost protection to approximately 82m of plastic pipework in the Effluent Plant.