The project scope within this English brewery, founded in 1874, was to provide trace heating to the following systems:
- Stream 1 pipe line 15m, for Sodium Hydroxide - trace heating and lagging
- Stream 2 pipe line 6m, for Sodium Hydroxide - trace heating and lagging
- Stream 3 pipe line 20m, for nutrient - lagging only
- Soium hyroxide dosing cabinet pipework 3m - trace heating and lagging