Friday 31 July 2009

Kings College London - Institute Of Psychiatry 
587m of type VC constant wattage tape was supplied to this new project.

Thursday 30 July 2009

West Lewis WTW - Isle Of Lewis
Supplied 250m of type FBTBOJ self limiting heating tape as well as 250m of 199mm thick x 35mm OD armaflex insulation.

Monday 27 July 2009

Picket Fence Pumping Station - Cheltenham
Supplied, installed and commissioned the frost protection trace heating of the external steel and iron pipework.

Friday 24 July 2009

B&Q Headquarters - Eastleigh
For this large project ESH supplied and installed the following trace heating: 

  • Temperature maintenance of 65C to the DHWS pipework, plus two off HWAT ECO controllers
  • Frost protection on category 5 cold water pipework

Thursday 23 July 2009

Roundhill STW - Stourbridge
To design and supply materials and labour to install and commission frost protection trace heating to 65m of washwater pipework and fittings associated with two Spirac machines and three Inlet screens.

Wednesday 22 July 2009

Springfields Fuels Ltd - Preston
For this industrial project, ESH supplied and installed trace heating to maintain the steam pipework at a minimum temperature of +200°C.

Monday 20 July 2009

Lions Yard Shopping Centre - Cambridge
For this chiller replacement project, ESH supplied and installed trace heating to provide frost protection of the chilled water and heating steel pipework.

Friday 17 July 2009

Riverside Primary School - Hereford
Supplied and installed trace heating to temperature maintain pipework carrying domestic hot water at +55°C.

Wednesday 15 July 2009

Le Pain Quotidien - London
For this lovely French restaurant in London, ESH provided frost protection to two separate lengths of metal pipework. Supply and install.

Friday 10 July 2009

Milton Keynes Academy 
Within this new academy, ESH supplied and installed type H2OWAT65 self regulating heating tape to provide temperature maintenance of +60°C to the HWS pipework.

Tuesday 7 July 2009

Victoria Halls - Wolverhampton
For Wolverhampton's largest student accommodation building, ESH supplied and installed trace heating and thermal insulation to provide frost protection to three runs of pipework:

  • 18m x 100mm tank infill
  • 18m x 100mm wet riser pipe
  • 16m x 180mm sprinkler main

Monday 6 July 2009

Harrogate South WWTW




ESH designed, supplied materials and labour to installed and commission trace heating and thermal insulation to provide frost protect 370m of external pipework.

Thursday 2 July 2009

Greenfrog Power Ltd - Hull
6m of fuel pipework was installed with type VC constant wattage heating cable to provide temperature maintenance at 65°C.