Friday 27 November 2009

Burscough WWTW - Southport
Designed, supplied and installed trace heating to provide frost protection in the following areas:

  • Jet mix pumping station, 30m of pipework
  • Lime area shower & hose pipework, 10m
  • Ferric Area shower & hose, 15m

Thursday 26 November 2009

SI Group UK - Wolverhampton
For this world leading chemical manufacturer ESH supplied and installed a trace heating system to frost protect 1" CWS to the new emergency shower pipework in a Zone 1 Gas Group 11b Classification T3 Hazardous Area.

Wednesday 25 November 2009

PZ Cousons - Salford
Trace heating was supplied and installed to provide frost protection to 12m of plastic pipework.

Monday 23 November 2009

Stepan (UK) Ltd - Cheshire
Designed, supplied and installed trace heating to two runs of metal pipework, 114m in total, to maintain +70°C and to keep within T4 classification. 114m of SCBX constant wattage heating tape for hazardous area.

Friday 20 November 2009

Rushmoor STW - Telford
58m of stainless steel pipework required frost protecting within this STW. ESH supplied and installed type FBT self limiting heating tape.

Wednesday 18 November 2009

Asda Store - South Woodham
Before this new Asda store opened, ESH supplied and installed both trace heating and thermal insulation to provide frost protection to 80m of fire sprinkler pipework.

Monday 16 November 2009

Stepan (UK) Ltd - Cheshire
100m of VCBOJ constant wattage trace heating cable was supplied and installed to maintain the 2" coconut oil pipe line & tank at +50°C.

Friday 13 November 2009

Lincoln County Hospital
Supplied 100m of type ESRS self limiting tape to be installed within the junior doctors ward.

Thursday 12 November 2009

Terram Limited - Pontypool 
Trace heating and thermal insulation was supplied and installed onto the Thermex pipework to maintain a temperature of +20°C. 140m of VC constant wattage heating cable was supplied and installed.

Wednesday 11 November 2009

ASDA Stores - Hinckley / Leyton

For the new Hinckley store ESH supplied and installed the Trace Heating and Thermal Insulation to frost protect 142m of sprinkler pipework. We also supplied 1100m of VC8/2 tape for the new Leyton ASDA.

http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
Asda Warehouse - Hinckley
For this project ESH supplied and installed both trace heating and thermal insulation to frost protect 142m of sprinkler pipework.

Tuesday 10 November 2009

DGISS Sports Hall - Corsham
Within the headquarters of the MOD's Directorate General of Information Services and Systems (DGISS), ESH supplied and installed frost protection trace heating in two air handling units areas, comprising of the chilled water & hot water flow & return pipework.

Friday 6 November 2009

Wigton WWTW
Supplied materials and labour to install and commission trace heating to provide frost protection to the external pipework and tank.

Thursday 5 November 2009

Stadco Ltd - Shrewsbury
This local project required us to supply and install a trace heating and lagging system to provide frost protection to the pipework associated with the duel pump module.