Thursday 30 April 2009

PZ Cousons - Manchester 
PZ Cussons is a major manufacturer of personal healthcare products and consumer goods.Trace heating was supplied and installed to provide frost protection to 15m of steel pipework. 

Thursday 23 April 2009

Ipswich Hospital - Incinerator Plant
To supply and install trace heating to maintain the Limestone Hopper at +160°C in a minimum ambient temperature of 0°C.

Tuesday 21 April 2009

Glaxosmithkline Effluent Plant - Maidenhead
ESH were contracted to design, supply materials and labour to install and commission 240v trace heating and thermal insulation to provide frost protection to 12 runs of plastic pipework in the Effluent Plant. 140m of type ESRSBOJ self limiting heat tape was required.

Friday 17 April 2009

Roslin BioCentre Ltd - Midlothian
Roslin BioCentre is a world-leading ‘centre of excellence’ for life sciences. For this project ESH supplied and installed trace heating to provide frost protection to the following pipework: 

  • Roof top CHW, BCWS and MCWS
  • Roof void BCWS and MCWS

Wednesday 15 April 2009

Bio Products Laboratory - Watford
The Bio Products Laboratory (BPL) is a company involved in the manufacture of human blood plasma products. The project here was to supply and install trace heating to maintain the caustic & vent pipework at +20°C in a minimum ambient temperature of -10°C.

Tuesday 14 April 2009

Cricket Pavilion - Wootton
For this pavilion ESH supplied materials and labour to install and commission trace heating to temperature maintain flow pipework carry domestic hot water to douches.

Monday 13 April 2009

Princes Dock - Liverpool
For this large scale project, ESH designed, supplied, installed and commissioned three ramp heating systems for the Princes Dock multi storey car park. Overall 700m of type FBTBOJ self limiting heating tape was required to complete the ramp heating systems.

Thursday 9 April 2009

Samlesbury Aerodrome - Blackburn
180m of VC constant wattage heating tape was supplied and installed to provide frost protection to external pipework.

Wednesday 8 April 2009

White House - Alveston
To supply and install trace heating to maintain 51m of DHWS pipework at +55°C.

Monday 6 April 2009

Sungard Control Centre - Woking
ESH were contracted to go back to this site to supply and install an additional 250m of frost protection trace heating to the external chilled water pipework.

Wednesday 1 April 2009

Hayden STW - Cheltenham
The project scope was to supply materials and labour to install and commission the frost protection trace heating of Ductile iron pipework within both the centrate and grit classifier areas.