Thursday 28 May 2009

University Of Glamorgan
Part of the kitchen refurbishment, ESH supplied materials and labour to install and commission the trace heating to provide temperature maintenance at +55°C to DHWS pipework. 

Friday 22 May 2009

Buckinghamshire University 
Within the new university building, ESH supplied and installed trace heating to provide frost protection on all CHW & MWS external water pipework, mounted on the roof.

Wednesday 20 May 2009

City Inns - Leeds
Our second project for this modern hotel involved ESH supplying and installing the trace heating system to provide frost protection to the chiller pipework.

Thursday 14 May 2009

Proctor & Gamble - Tyne Wear
For this leading consumer product company, ESH supplied and installed trace heating and thermal insulation to frost protect pipework in the dry pallet area.

Tuesday 12 May 2009

Libanus Primary School - Newport
120m of DHWS pipework was installed with type H20WAT55 heating tape, in order to temperature maintain the pipework at +55°C. Trace heating was supplied and installed by ESH.

Saturday 9 May 2009

Lewes Castle & Barbican House Museum
ESH supplied this project with our type VC constant wattage heating cable.

Friday 1 May 2009

City Inn - Leeds


Now the Hilton Leeds, ESH supplied and installed Trace Heating to maintain the domestic hot water system at 55 degrees C. To cover this 333 bedroom modern hotel we needed over 900m of H2OWAT65 heating cable.