Friday 27 February 2009

Guildford Clinic 
ESH supplied and installed trace heating to frost protect the external CHW pipework.
Shiplake College - Oxfordshire
ESH were contracted to supply and install trace heating to maintain the domestic hot water pipework at 55°C, with the ability to raise the pipework to 65°C for disinfection purposes.

Monday 23 February 2009

Salisbury County Courts


ESH supplied and installed Trace Heating to provide frost protection to approximately 1050m of metal pipework within this three storey building. The pipework include the CHW, MWS, BCWS, HWS and Heating pipes.

http://www.traceheatingdirect.com/self-regulating-heating-tapes/self-regulating-heating-tape-type-fbt.html
Andrew Corporation - USA
Designed and supplied 32 x 3.7m dish heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Friday 20 February 2009

BT Stadium House - Cardiff
Stadium House is the second tallest building in Cardif and is owned by the BT Group. During its 7.1m refurbishment programme, ESH were contracted to supply and install trace heating to provide frost protection to approximately 110m of ABS pipework. 

Wednesday 18 February 2009

Avonmouth STW
Trace heating for approximately 160m of pipework using type SCBX (ATEX Certified) constant wattage heating tape. ESH supplied and install the frost protection system on four sets of sludge pipework in an area classified as electrically hazardous.

Monday 16 February 2009

The Peel Centre - Bracknell
Supplied materials and labour to install and commission a trace heating system to provide frost protection for the 200mm & 50mm Ø pipework.

Thursday 12 February 2009

Stepan (UK) Ltd - Cheshire
Supplied and installed a temperature maintenance system designed to maintain +70°C within a Hazardous area.

Tuesday 10 February 2009

Glasgow Caledonian University
Designed and supplied 3 x IGS glass insulated high temperature heating tapes, 6m long 2500 watts 240v.

Monday 9 February 2009

Queens University - Belfast
Supplied 854m of type FBT self regulating heating tape to provide frost protection to the steel pipework.

Wednesday 4 February 2009

Halewood International - Liverpool
Halewood have grown to become the UK's largest independent alcoholic beverages manufacturer and ESH were contracted to supply and install trace heating to provide temperature maintenance at +55°C to the stainless steel glucose pipework.

Tuesday 3 February 2009

Hidcote Manor - Chipping Campden
This national trust owned building is surrounded by some of the best known and influential arts and crafts gardens in Britain. For the main building ESH supplied and installed trace heating to frost protect two runs of cold water copper pipework.

Monday 2 February 2009

Lydney STW
54m of steel pipework was installed with type VC constant wattage heating tape to provide frost protection.