Tuesday 22 December 2009

Vanguard Packaging Ltd - Lincoln
For this project ESH supplied and installed trace heating to maintain the skid pipework at a temperature of +60°C in a minimum ambient temperature which could be between +13°C and +50°C. 250m of HFBT (ATEX approved) high temperature self regulating heating tape required.

Monday 21 December 2009

Premier Foods Ltd - Kent
Supplied 60m of type SC constant wattage cable.

Friday 18 December 2009

Morris Lubricants - Shrewsbury
This large scale project required 2500m of constant wattage cable to complete the work. ESH designed and supplied materials and labour to install and commission trace heating to maintain the internal blending pipework at a temperature of +60°C and the tank farm pipework at +25°C.

Thursday 17 December 2009

Fareham Community Hospital 
To design and supply materials, tools and labour to install and commission self regulating trace heating to frost protect 79m of metal pipework.

Monday 14 December 2009

Leigh WWTW
ESH provided frost protection trace heating to the metal construction external pipework. 70m of FBT self regulating trace heating tape was supplied and installed.

Friday 11 December 2009

Bardon Quarry - Coalville
To supply and install trace heating to provide frost protection of the wash water pipework in the Ten Plant Load House. In total 166m of VC constant wattage cable was required.

Wednesday 9 December 2009

Petersfinger STW - Salisbury
Ferric Chloride frost protection trace heating. ESH supplied and installed 63m of ESRS self limiting heating tape to frost protect the ferric chloride pipework and fittings.

Monday 7 December 2009

Baton Lane WWTW - Preston
60m of metal construction pipework was surface heated to provide frost protection. Type FBT self regulating heating tape was supplied and installed.

Wednesday 2 December 2009

Snarrows STW - Osgathorpe
To supply and install a trace heating system to frost protect the washwater pipework in the inlet works area: 

  • Upper screen area, 16m
  • Longmoor screen area, two sets 4m each

Tuesday 1 December 2009

Building 7, Harbourside - Bristol 
For this project ESH supplied and installed the following trace heating systems: 

  • To prove frost protection to 488m of CHW and heating pipework, between 65mm and 150mm size pipe
  • To provide frost protection to 87m of 40mm and 25mm dia MCW pipework to the AHU and humidifiers