Tuesday 30 June 2009

Immaculate Conception Catholic Primary School - Sheffield 
350m of H2OWAT55 self regulating trace heating tape was supplied and installed to the DHWS pipework in order to maintain the temperature at +55°C.

Monday 29 June 2009

Kimberleys Chocolate - Burton On Trent
Supplied type VC constant wattage cable to be installed onto the sprinkler system.

Monday 22 June 2009

Stepan (UK) Ltd - Cheshire
ESH supplied materials and labour to install and commission the trace heating system to provide frost protection to the following pipework: 

  • 20m within the Sulphonic area
  • 20m in the Sulphonic Drumming off area
  • 75m within the Organics Tank farm area

Friday 12 June 2009

The Generating Station - Monmouthshire
The project was to trace heat 261m of steel pipe from 21mm OD to 89mm OD using type VC constant wattage heating tape, arranged in 6 heating zones. The pipework was to be temperature maintained at +60°C and contained oil.

Wednesday 10 June 2009

Livestock Market - Sterling
280m of type VC constant wattage heating tape was supplied to this site.

Friday 5 June 2009

Uniq Prepared Foods - Minsterley
Our second project within this site involved supplying and installing a trace heating system to maintain palm oil pipework at +50°C.

Tuesday 2 June 2009

Walsall Security Printers
To supply and install trace heating and thermal insulation to provide frost protection to the cold water pipework.

Monday 1 June 2009

Asda Supermarket - Glenrothes 
Supplied type ESRSBJO self limiting heating tape to be installed within this new ASDA store.