Stoke City General Hospital
The project scope was to supply and install trace heating to frost protect steel CHW pipework (Terrace area) and copper cooling water pipe (Linac area). The second part to this project saw ESH design, supply and install a leak detection system in the PL1 tank room (LVC system).