Monday 24 August 2009

The Generating Station - Monmouthshire
To supply and install temperature maintenance trace heating: 

  • Two runs of 25mm stainless steel pipe ewach approx 15m long, 
  • Five short extensions to previously installed trace heating, at burner pipe connections. All 21mm stainless steel pipe.

No comments:

Post a Comment