2009 Project List
Monday 24 August 2009
The Generating Station - Monmouthshire
To supply and install temperature maintenance trace heating:
Two runs of 25mm stainless steel pipe ewach approx 15m long,
Five short extensions to previously installed trace heating, at burner pipe connections. All 21mm stainless steel pipe.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment