Crawshaw School - Pudsey
The project scope was to design, supply materials and tools to install and commission trace heating to maintain the DHWS pipework at a temperature of +55°C, with the facility to purge the system to +65°C once a week via a control module. In total 400m of H2OWAT65 was supplied and installed.