Vanguard Packaging Ltd - Lincoln
For this project ESH supplied and installed trace heating to maintain the skid pipework at a temperature of +60°C in a minimum ambient temperature which could be between +13°C and +50°C. 250m of HFBT (ATEX approved) high temperature self regulating heating tape required.
Tuesday, 22 December 2009
Friday, 18 December 2009
Morris Lubricants - Shrewsbury
This large scale project required 2500m of constant wattage cable to complete the work. ESH designed and supplied materials and labour to install and commission trace heating to maintain the internal blending pipework at a temperature of +60°C and the tank farm pipework at +25°C.
This large scale project required 2500m of constant wattage cable to complete the work. ESH designed and supplied materials and labour to install and commission trace heating to maintain the internal blending pipework at a temperature of +60°C and the tank farm pipework at +25°C.
Thursday, 17 December 2009
Monday, 14 December 2009
Friday, 11 December 2009
Wednesday, 9 December 2009
Monday, 7 December 2009
Wednesday, 2 December 2009
Tuesday, 1 December 2009
Friday, 27 November 2009
Thursday, 26 November 2009
Wednesday, 25 November 2009
Monday, 23 November 2009
Friday, 20 November 2009
Wednesday, 18 November 2009
Monday, 16 November 2009
Friday, 13 November 2009
Thursday, 12 November 2009
Wednesday, 11 November 2009
ASDA Stores - Hinckley / Leyton
For the new Hinckley store ESH supplied and installed the Trace Heating and Thermal Insulation to frost protect 142m of sprinkler pipework. We also supplied 1100m of VC8/2 tape for the new Leyton ASDA.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
For the new Hinckley store ESH supplied and installed the Trace Heating and Thermal Insulation to frost protect 142m of sprinkler pipework. We also supplied 1100m of VC8/2 tape for the new Leyton ASDA.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
Tuesday, 10 November 2009
Friday, 6 November 2009
Thursday, 5 November 2009
Tuesday, 27 October 2009
Crawshaw School - Pudsey
The project scope was to design, supply materials and tools to install and commission trace heating to maintain the DHWS pipework at a temperature of +55°C, with the facility to purge the system to +65°C once a week via a control module. In total 400m of H2OWAT65 was supplied and installed.
The project scope was to design, supply materials and tools to install and commission trace heating to maintain the DHWS pipework at a temperature of +55°C, with the facility to purge the system to +65°C once a week via a control module. In total 400m of H2OWAT65 was supplied and installed.
Friday, 23 October 2009
Tuesday, 20 October 2009
Monday, 19 October 2009
Friday, 16 October 2009
Thursday, 15 October 2009
Wednesday, 14 October 2009
Monday, 12 October 2009
Thursday, 8 October 2009
Wednesday, 7 October 2009
Wednesday, 30 September 2009
Monday, 28 September 2009
Friday, 25 September 2009
Thursday, 24 September 2009
Wednesday, 23 September 2009
Tuesday, 22 September 2009
Tuesday, 15 September 2009
Monday, 14 September 2009
Thursday, 10 September 2009
Friday, 4 September 2009
Friday, 28 August 2009
Tuesday, 25 August 2009
Monday, 24 August 2009
Sunday, 23 August 2009
Tuesday, 18 August 2009
Monday, 17 August 2009
Friday, 14 August 2009
Thursday, 13 August 2009
Tuesday, 11 August 2009
Friday, 31 July 2009
Thursday, 30 July 2009
Monday, 27 July 2009
Friday, 24 July 2009
Thursday, 23 July 2009
Wednesday, 22 July 2009
Monday, 20 July 2009
Friday, 17 July 2009
Wednesday, 15 July 2009
Friday, 10 July 2009
Tuesday, 7 July 2009
Monday, 6 July 2009
Thursday, 2 July 2009
Tuesday, 30 June 2009
Monday, 29 June 2009
Monday, 22 June 2009
Friday, 12 June 2009
Wednesday, 10 June 2009
Friday, 5 June 2009
Tuesday, 2 June 2009
Monday, 1 June 2009
Thursday, 28 May 2009
Friday, 22 May 2009
Wednesday, 20 May 2009
Thursday, 14 May 2009
Tuesday, 12 May 2009
Saturday, 9 May 2009
Friday, 1 May 2009
Thursday, 30 April 2009
Thursday, 23 April 2009
Tuesday, 21 April 2009
Glaxosmithkline Effluent Plant - Maidenhead
ESH were contracted to design, supply materials and labour to install and commission 240v trace heating and thermal insulation to provide frost protection to 12 runs of plastic pipework in the Effluent Plant. 140m of type ESRSBOJ self limiting heat tape was required.
ESH were contracted to design, supply materials and labour to install and commission 240v trace heating and thermal insulation to provide frost protection to 12 runs of plastic pipework in the Effluent Plant. 140m of type ESRSBOJ self limiting heat tape was required.
Friday, 17 April 2009
Wednesday, 15 April 2009
Tuesday, 14 April 2009
Monday, 13 April 2009
Thursday, 9 April 2009
Wednesday, 8 April 2009
Monday, 6 April 2009
Wednesday, 1 April 2009
Thursday, 26 March 2009
Wednesday, 25 March 2009
Friday, 20 March 2009
Monday, 16 March 2009
Friday, 13 March 2009
Thursday, 12 March 2009
Wednesday, 11 March 2009
Friday, 6 March 2009
Wednesday, 4 March 2009
Monday, 2 March 2009
Friday, 27 February 2009
Monday, 23 February 2009
Salisbury County Courts

ESH supplied and installed Trace Heating to provide frost protection to approximately 1050m of metal pipework within this three storey building. The pipework include the CHW, MWS, BCWS, HWS and Heating pipes.
http://www.traceheatingdirect.com/self-regulating-heating-tapes/self-regulating-heating-tape-type-fbt.html

ESH supplied and installed Trace Heating to provide frost protection to approximately 1050m of metal pipework within this three storey building. The pipework include the CHW, MWS, BCWS, HWS and Heating pipes.
http://www.traceheatingdirect.com/self-regulating-heating-tapes/self-regulating-heating-tape-type-fbt.html
Friday, 20 February 2009
Wednesday, 18 February 2009
Monday, 16 February 2009
Thursday, 12 February 2009
Tuesday, 10 February 2009
Monday, 9 February 2009
Wednesday, 4 February 2009
Tuesday, 3 February 2009
Monday, 2 February 2009
Saturday, 31 January 2009
George Bateman Brewery - Wainfleet
The project scope within this English brewery, founded in 1874, was to provide trace heating to the following systems:
The project scope within this English brewery, founded in 1874, was to provide trace heating to the following systems:
- Stream 1 pipe line 15m, for Sodium Hydroxide - trace heating and lagging
- Stream 2 pipe line 6m, for Sodium Hydroxide - trace heating and lagging
- Stream 3 pipe line 20m, for nutrient - lagging only
- Soium hyroxide dosing cabinet pipework 3m - trace heating and lagging
Friday, 30 January 2009
Wednesday, 28 January 2009
Tuesday, 27 January 2009
Monday, 26 January 2009
Friday, 23 January 2009
Thursday, 22 January 2009
Thursday, 15 January 2009
Tuesday, 13 January 2009
Monday, 12 January 2009
Stoke City General Hospital
The project scope was to supply and install trace heating to frost protect steel CHW pipework (Terrace area) and copper cooling water pipe (Linac area). The second part to this project saw ESH design, supply and install a leak detection system in the PL1 tank room (LVC system).
The project scope was to supply and install trace heating to frost protect steel CHW pipework (Terrace area) and copper cooling water pipe (Linac area). The second part to this project saw ESH design, supply and install a leak detection system in the PL1 tank room (LVC system).